BP7 - Improve refrigeration
| Company name: MINH DANG Co., Ltd | |
| Address: 83 Provincial Road 8, My Xuyen Town, My Xuyen District, Soc Trang Province | |
| Project Summary: An investment project in improving the refrigeration system with many solutions. The project goal is to reduce the energy costs and emission of greenhouse gases. | |
| Year of implementation: 2018 | |
|
Status before implementation The refrigeration system is the largest energy consuming system in the factory. Currently, the factory has 3 refrigeration systems operating independently, using NH3 refrigerant.
Compressor room of the factory The plant would merge the three existing separate refrigeration systems into a new one. At the same time, the plant also installed a lot of new equipment to enhance the energy efficiency of the refrigeration system such as: installation of a water & non-condensing air separator from NH3, installation of a water chiller and heat exchanger to reduce the amount of flake ice in use, installation of a device that automatically controls the compressor capacity to suit the cold load of the system. |
Result The total electricity consumed has reduced by 28.3% thanks to the improved refrigeration system.
Refrigeration system after improvement
Water separator |
|
Status before implementation The refrigeration system is the largest energy consuming system in the factory. Currently, the factory has 3 refrigeration systems operating independently, using NH3 refrigerant.
Compressor room of the factory The plant would merge the three existing separate refrigeration systems into a new one. At the same time, the plant also installed a lot of new equipment to enhance the energy efficiency of the refrigeration system such as: installation of a water & non-condensing air separator from NH3, installation of a water chiller and heat exchanger to reduce the amount of flake ice in use, installation of a device that automatically controls the compressor capacity to suit the cold load of the system. |
|
|
Result The total electricity consumed has reduced by 28.3% thanks to the improved refrigeration system.
Refrigeration system after improvement
Water separator |
|
| Result of the project: | |
| Total investment costs: | VND 5,573 Million |
| Power saving: | 959,385 kWh/ year |
| Cost savings: | VND 1,588 Million |
| Payback time: | 3.5 years |