BP23 - Replace boiler by heat pump
| Address: District 1, HCM City | |
| Project Summary: A building in Ho Chi Minh City has replaced the boiler with a heat pump system. | |
| Year of implementation: 2016 | |
|
Status before implementation The hotel produced hot water by steam from 2 boilers (3 tons/hour, using DO oil). Hot water temperature was being set at 60°C. The amount of oil used for the boiler was estimated at 9,059 liters/2 weeks.
The boiler system using DO oil In addition, the use of oil-fired boilers had an impact on safety and energy efficiency. |
Result The hotel has replaced the hot water system using boilers with a Heat pump system. According to the measurement results, the electricity consumption of the Heat pump system is 166,800 kWh/year, with the operating cost of VND 454 million/year.
Heat pump system and operating parameters |
|
Status before implementation The hotel produced hot water by steam from 2 boilers (3 tons/hour, using DO oil). Hot water temperature was being set at 60°C. The amount of oil used for the boiler was estimated at 9,059 liters/2 weeks.
The boiler system using DO oil In addition, the use of oil-fired boilers had an impact on safety and energy efficiency. |
|
|
Result The hotel has replaced the hot water system using boilers with a Heat pump system. According to the measurement results, the electricity consumption of the Heat pump system is 166,800 kWh/year, with the operating cost of VND 454 million/year.
Heat pump system and operating parameters |
|
| Result of the project: | |
| Total investment costs: | VND 4,500 Million |
| Power saving: | |
| Cost savings: | VND 1,097 Million |
| Payback time: | 4.1 years. |