BP36 - Improve compressed air system
| Address: Thuy Nguyen District, Hai Phong City | |
| Name of the Manager: Mr. YIU KA SO | |
| Project Summary: In response to the energy efficiency program of Adidas brand, a garment enterprise in Hai Phong City has carried out a project of compressed air system improvement. The goal of the project is to reduce energy costs and greenhouse gas emissions. | |
| Year of implementation: 2018 | |
|
Status before implementation The B2 compressor room temperature was quite high compared to the ambient temperature.
The separate compressed air system reduced the overall efficiency of the air compressors.
|
Result Hot air exhaust pipes have been connected to the compressor in B2 zone.
After improvement With the compressors in zones A and C, the factory has combined the air compressors into a system and reinstalled operating pressure from 6.5 to 7 bar. |
|
Status before implementation The B2 compressor room temperature was quite high compared to the ambient temperature.
The separate compressed air system reduced the overall efficiency of the air compressors.
|
|
|
Result Hot air exhaust pipes have been connected to the compressor in B2 zone.
After improvement With the compressors in zones A and C, the factory has combined the air compressors into a system and reinstalled operating pressure from 6.5 to 7 bar. |
|
| Result of the project: | |
| Total investment costs: | Annual maintenance |
| Power saving: | 42,681 kWh/ year |
| Cost savings: | VND 73.7 Million |
| Payback time: | Immediately |