BP5 - Replace boiler
| Company name: LAM HUNG PACKINGS PRODUCTION - TRADE - SERVICE LIMITED COMPANY | |
| Address: Lot E8, Street 13, Thuan Dao Industrial Park, Long Dinh Commune, Can Duoc District, Long An Province | |
| Project Summary: Replacement of a coal-fired boiler with a biomass boiler. The project objective is to reduce energy costs and greenhouse gas emission | |
| Year of implementation: 2016 | |
|
Status before implementation The company was using:
Existing boiler Dust coal To meet the need of production output increase and factory relocation, instead of relocating the existing boiler to new location, the Company planned to procure a biomass fluidized bed boiler with capacity of 4 tons of steam/hour to ensure an adequate amount of steam for the production process and greenhouse gas emission elimination. |
Result The company has invested in:
This helps the company reduce CO2 emission by 100% compared to the existing coal-fired boiler.
New biomass boiler installed at the factory |
|
Status before implementation The company was using:
Existing boiler Dust coal To meet the need of production output increase and factory relocation, instead of relocating the existing boiler to new location, the Company planned to procure a biomass fluidized bed boiler with capacity of 4 tons of steam/hour to ensure an adequate amount of steam for the production process and greenhouse gas emission elimination. |
|
|
Result The company has invested in:
This helps the company reduce CO2 emission by 100% compared to the existing coal-fired boiler.
New biomass boiler installed at the factory |
|
| Result of the project: | |
| Total investment costs: | VND 3,450 Million |
| Power saving: | 8,170,686 MJ |
| Cost savings: | VND 2,359 Million |
| Payback time: | 1.5 years |


